How we scope it
Every shoot is engineered to its plate.
We don't publish a rate card. The number on your shoot depends on what you're building — operator count, workstation and nDisplay config, LED panel count and processors, content and environment build, plus how much pre-light and strike live inside our window. Send us a brief and we'll engineer the quote to it.
Most LA production days run two operators — primary on nDisplay, second on content and backup. Need a directional read first? Run the LED Wall Calculator — it returns panel count, weight, power draw, and a sense-check band you can take to your CFO before you send a brief.